COVER VOL.4 NO.2 APRIL 2022

P- ISSN : 2656-9434 ; E- ISSN : 2656-9906

DOI 10.35439 

 

ANALISA SISTEM UDARA PEMBAKARAN DAN GAS BUANG PADA BOILER CFB UNIT 3  DI PT. INDO RIDLATAMA POWER

Wildan Mukhollad Yasin, Rachmasari Pramita Wardhani

EVALUASI BAHAYA DAN PENGENDALIAN RISIKO KECELAKAAN KERJA PADA PROYEK PENINGKATAN JALAN JENEBORA I DAN JENEBORA II  KALIMANTAN TIMUR

Hikmah Maya Sari, Abdullah

ANALISA PENGGUNAAN TURBIN UAP PLTU MUARA JAWA DENGAN KAPASITAS DAYA 27.5 MW

Wildan Mukhollad Yasin, Rachmasari Pramita Wardhani,Rissetridharma Simanjuntak.

PENERAPAN MATA KULIAH PERALATAN KONSTRUKSI DAN PENGANGKAT UNTUK  MENINGKATKAN MUTU PEMBELAJARAN DI PROGRAM STUDI TEKNIK MESIN UNIVERSITAS TRIDHARMA

Rachmasari Pramita Wardhani, Sunarji, Rissetridharma Simanjuntak, Kusnadi, Erwin Gustianta

ANALISA PENGGUNAAN DELIVERY STAND CAGE RECOIL SPRING DOZER D375 KOMATSU DI PT. PAMA

Yusfian, Rachmasari Pramita Wardhani, Sunarji

*klik click title to view journal

Published: 2022-04-30